The system built to manage Russia’s nuclear legacy is crumbling, our new report shows
Our op-ed originally appeared in The Moscow Times. For more than three decades, Russia has been burdened with the remains of the Soviet ...
News
Publish date: November 21, 2005
News
The scientists suggest to treat nuclear waste by tempering it, i.e. to transfer it into safer forms, convenient for all stages of handling: storage, shipment and final disposal. This approach assumes different methods of treatment.
After all methods were thoroughly studied, Russian and German specialists developed the one that is the most adequate for the plant. At the moment finishing and main equipment mounting works are in progress inside the huge LRWT building: ventilation, cabling, piping and installation of radionuclides purification system.
The main purpose of RWE NUKEM visit to the Kola NPP was negotiating on warranty services of the supplied equipment, so called A1/A4 facility (radioactive substances extraction plant) and A2 (conditioning system). The Kola NPP informed their German partners on the coming comprehensive tests of the system on December 22, 2005. LRWT plant commissioning terms is December 30, 2005, the Kola NPP press department informed. The TACIS program and the Rosatom Company sponsor the project.
Our op-ed originally appeared in The Moscow Times. For more than three decades, Russia has been burdened with the remains of the Soviet ...
The United Nation’s COP30 global climate negotiations in Belém, Brazil ended this weekend with a watered-down resolution that failed to halt deforest...
For more than a week now — beginning September 23 — the Zaporizhzhia Nuclear Power Plant (ZNPP) has remained disconnected from Ukraine’s national pow...
Bellona has taken part in preparing the The World Nuclear Industry Status Report 2025 and will participate in the report’s global launch in Rome on September 22nd.