The system built to manage Russia’s nuclear legacy is crumbling, our new report shows
Our op-ed originally appeared in The Moscow Times. For more than three decades, Russia has been burdened with the remains of the Soviet ...
News
Publish date: January 31, 2005
News
The winner of the auction is a legal entity, but its name was not mentioned, obkom.net.ua reported.
The construction of this nuclear plant began in 1976, but was stopped in 1989 due to the danger of earthquake. The USSR spent about $1 billion. Whole Schelkino town was built up to serve the future nuclear plant. The storage facilities of the unfinished nuclear plant contained materials for $400m.
Last year the Ukrainian Government handed over the Crimean NPP, which belonged to the Ukrainian Ministry of fuel and energy, to the Crimea republic. The Crimea republic was ordered to sell the remains of the plant and spent the revenues for solving social and economic problems of the Lenin region of the Crimea, where the plant is situated, and for town Schelkovo. The nuclear plant has never received nuclear fuel.
Our op-ed originally appeared in The Moscow Times. For more than three decades, Russia has been burdened with the remains of the Soviet ...
The United Nation’s COP30 global climate negotiations in Belém, Brazil ended this weekend with a watered-down resolution that failed to halt deforest...
For more than a week now — beginning September 23 — the Zaporizhzhia Nuclear Power Plant (ZNPP) has remained disconnected from Ukraine’s national pow...
Bellona has taken part in preparing the The World Nuclear Industry Status Report 2025 and will participate in the report’s global launch in Rome on September 22nd.