![Illustration from Akkuyu Nuclear communications service photo by Bellona](https://network.bellona.org/content/uploads/sites/3/2024/07/2024-05-2000_1400.jpg)
Bellona nuclear digest. May 2024
A survey of events in the field of nuclear and radiation safety relating to Russia and Ukraine.
News
Publish date: August 29, 1997
Written by: Igor Kudrik
News
The 25 year old TNT-25, once used for dumping operations in the Barents Sea (and last known to do that in 1991), has been moored at Zvezdochka yard for at least four years, unable to go out at sea. TNT’s hull is badly affected by corrosion and the boat requires dock repairs.
This time the money for the repairs is available; the problem is the 500 cubic meters of liquid radwaste stored on-board. This summer 450 cubic meters of radwaste from the tanker were processed (it was filled to capasity). For the remaining volume of the contaminated water, there is still no solution. The original plans presumed the dock repairs to be finished by the end of 1996.
The Northern Fleet operates four specially constructed tankers of the Vala class (project 1783A). Their average age is 25 years. A fifth Vala-class tanker was taken out of operation some three years ago.
A survey of events in the field of nuclear and radiation safety relating to Russia and Ukraine.
But it’s unlikely to impact emissions from shipping along the Northern Sea Route.
In this news digest, we monitor events that impact the environment in the Russian Arctic. Our focus lies in identifying the factors that contribute to pollution and climate change.
The following op-ed, written by Bellona’s Charles Digges, originally appeared in The Moscow Times. In recent months, the Russian nuclear in...